|
The Millennium HongQiao Hotel Shanghai
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Shanghai, China - June 16, 2014
The year 2013-2014 will see a new round of historical highs for global offshore engineering market.
China's three major oil companies are continuously investing in exploration and development of equipment:
• CNOOC will continue to invest 120 billion yuan in purchasing oil equipment for offshore oil & gas exploration and development in the future 5-10 years,
• CNPC will plan on investing 60 billion yuan to build 57 large offshore oil equipment before 2020, and
• SINOPEC is also actively preparing for the Offshore oil equipment arrangement.
|
Courtesy of Merisis Consulting |
|
In another aspect, the Decision of State Council on accelerating the fostering and development of strategically emerging industries has pointed out that the offshore engineering equipment industry has been one of the focuses of growing and development in those strategically emerging industries.
|
Courtesy of Merisis Consulting |
|
To promote China's end of developing high value-added and independent offshore equipment, the Ministry of Industry and Information Technology, the Ministry of Finance and other departments are studying on tax and fiscal supporting policies specifically for offshore high-end equipment.
|
Courtesy of Merisis Consulting |
|
Despite of the circumstances of good policies and active markets, there still remains shortage of design capability, weak R&D in the supporting products, lack of ability in EPC etc.
|
Courtesy of Merisis Consulting |
|
On this occasion, Merisis Consulting and SSNAOE Ocean Engineering Academic Committee will co-host the “5th Offshore Engineering Summit 2014, namely SSNAOE Ocean Engineering Academic Committee Annual Conference” in Shanghai, 18-19 September, 2014.
|
The Millennium HongQiao Hotel Shanghai
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
The summit will focus the key issues on the latest activities of offshore oil and gas exploration and the market trend analysis, engineering equipment design, construction and advanced technologies sharing in MODUs, FPSO, LNG, OSV, HSE management popularized in offshore engineering projects.
|
The Millennium HongQiao Hotel Shanghai exterior
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Starting from these issues, we are committed to building an efficient information exchange platform for industry colleagues to discuss the development and the breakthrough of offshore engineering equipment.
|
The Millennium HongQiao Hotel Shanghai Lobby
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
In this conference, we will be exploring the following questions and questing for the answers:
- Aiming at the new business opportunities in engineering equipment field, well understand recent offshore oil exploration project information and the owner's demand.
- Focusing on industrial standards regulations in the field of offshore & ship, satisfy your most need to listen.
- Discussing an In-depth technical sharing on design, construction and advanced technology in MODUs, FPSO, LNG, OSV.
- Learning from the international most effective HSE management experience, combined with international standard and enterprise development.
|
The Millennium HongQiao Hotel Shanghai Lobby
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
We are inviting the speakers include:
David Zhang, Vice President, National One Thousand Professionals’ Plan, DMAR Engineering Inc.
Qingping Li, Chief engineer of deep-water laboratory, CNOOC Research Institute.
Weimin Chen, Director of Offshore Business Development, China State Shipbuilding Corporation.
Peilin Liu, Chief Engineer, CNOOC Offshore Engineering Design Company.
Hongbo Liu, Senior Consultant of Offshore Project Management Center, China National Petroleum Corporation (CNPC).
Xiaojian Jin, General Manager of Planning Dept, China National Offshore Oil Corporation (CNOOC).
Subhash C. Gangahar, Topside Engineering Manager, MODEC.
Zheng Jun Tian, Technical Director, AVIC Dingheng Shipbuilding Co.,Ltd.
BH Wong, Executive Director of Ezra Holdings Limited, Singapore C Mohan, QA/QC Inspector, EMAS Offshore Construction & Production Pte Ltd.
Xinzhong Li, Chief Engineer-Offshore Engineering, CNOOC Research Institute Representative from Classification Society.
Naveen Satanand Singhal, Managing Director, JAG Consultants Pte Ltd.
Danping Lou, Deputy Chief Engineer, President of Development & Design Institute, Hudong Zhonghua Shipbuilding (Group) Co.,Ltd.
John Newington, Managing Director, Phoenix Offshore Marine Pte Ltd.
Ajith PJ, Technical Director–Projects, Aries Marine.
|
The Millennium HongQiao Hotel Shanghai Lobby
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Highlights of the session topics include:
Day One Morning
Recent offshore oil exploration industry information and development trend
9:00 Prospect analysis: A new round investment opportunities in offshore market
- Development prospect of oil & gas market in Asia Pacific, Africa, Middle East
- Prospect forecast main offshore engineering equipment in the future 10 years
- Predict the future oil companies and EPC in the aspect of equipment construction financing, contract model and procurement type of bias
- Update of global wind farm projects and its opportunity in OSV construction market
9:30 China offshore market recent project overview and the trend analysis
- Current hand-held orders summary
- Situation of receiving orders from shipyards and offshore constructors in the first half of 2013 ~ 2014
- Recent orders of different equipment price comparison
- Predict future watched equipment types
10:00 Tea Break
|
The Millennium HongQiao Hotel Shanghai Lobby
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
10:20 China oil companies latest oil & gas exploration process and projects information
- South China sea exploration and block operations
- Overseas cooperative exploration
- Construction plan and investment
- New requirement of technology and equipment
10:50 Exploring the current situation and challenges of deep-water oilfield development: Liwan 31 Project in China
11:20 Panel Discussion: Offshore engineering standard specification - establishment & influence
- Recent situation of offshore engineering equipmentstandardization in China
- Foreign system reference
- Special requirements and standard in different types of offshore equipment
- Regulations of IMO and other international organization
12:00 Lunch
|
The Millennium HongQiao Hotel Shanghai Event
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Day One Afternoon
Comprehensive analysis offshore engineering onHealth, Safety, Environment (HSE) and new technologies
13:30 Thelatest international standard enlightenment to China’s development of HSE management system
- Industry response to the UN global mercury treaty negotiations focus on oil and gas
- Challenges when Ambient Air Standards are set near background levels
- ISO - ISO Standards - ICS 13: Environment. Health protection. Safety
14:00 The process of oil & gas exploration control technology and risk analysis
- HSE challenges while testing and completion of sour HPHT exploratory wells
- An experimental investigation of the effects of ultra-high pressure and temperature
on the rheological properties of water-based drilling fluids
- Improving safety performance in geophysical operations
14:30 Case study on oil spill recovery
- Implementing the Coastal Oil Spill Preparedness Improvement Programme (COSPIP)
- Memorandum of understanding comprehensive joint &industrial project(JIP)
- Focusing on coastal oil spill challenges
- Technical issues in oil response
15:00 Tea Break
|
The Millennium HongQiao Hotel Shanghai Dining Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
16:00 Panel Discussion: Summarizes the main risks of offshore oil and gas exploration, discuss on omnidirectional risk prevention measures
- The Challenge of “Getting to Zero”
- Integration of HSE into Project Planning
- Learn experience of international oil spill accidents
- Discussion on the offshore pipeline fatigue risk management
- How to cooperative parties taking emergency action to deal with oil spill accident
16:45 End of Day One
|
The Millennium HongQiao Hotel Shanghai Dining Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Day Two
Offshore Engineering Equipment-Design, Construction and Advanced Technology
9:00 Optimal FPSO topsides layout for operational flexibility &safety
- FPSO topsides engineering: From concept to FEED and design
- Risk management strategies – assessing and mitigating risks associated with FPSO topside design and layout
- Top tips in piping design
- How you can determine the layout of you FPSO topside for maximum performance
- Understand how you can effectively deal with structural issues
9:30 Updated FPSO modules construction techniques suitable for topsides standardization
- Does standard is a add value to FPSO topsides?
- Cons of FPSO topsides standardization
- Ways to go for standardization
- Balance control of standardization and variation
10:00 Best practices in topside engineering
- Upgrading FPSO topside projects: ensuring that all parties in the supply chain understand the risk in project execution
- Case study of FPSO topside upgrading: what are the challenges involved and the strategies used to ensure successful project delivery?
- Best practices in topside engineering for both conversion and new build FPSOs
10:30 Tea break
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
11:00 Latest advancements in powering solutions for FPSOs
- Integrated powering services for FPSOs: how dothey affect CAPEX and OPEX?
- The innovative electrical low loss concept for FPSO
- Reviewing the future of powering technology for theFPSO market
11:30 Conquering the challenges of building large LNG ship
- Optimal LNG carrier type and size in accordance to shipping operations profile
- Commercial and technical criteria for selecting containment systems, engines and propulsions
- Design and construction innovations for lowering per unit LNG transportation costs, maximum operational flexibility, maneuverability and safety
12:00 The world’s largest floating offshore facility ‘Prelude FLNG’- construction & technology
- The world’s largest floating offshore facility: size & creativity
- Effective project management how to shorten the construction period and ensure the quality and cost
- Designed to withstand the most powerful tropical cyclones
- Advanced technologies in cryogenic transfer
12:30 Luncheon
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
13:30 Key components and key equipment for offshore platforms
- Key components in different projects
- Operation difficulties in positioning
- Measurement technology and equipment
- The practice of foreign offshore constructors
14:00 New generation of drilling ship development and overall performance analysis
- Global projects and design features
- Based ondesign requirement from deep sea operation situation
- Type selection and design, and cabin layout and division
- Technical measures to overcome the lack of stability
15:00 Dynamic positioning IMO Class 3: applied to a 4-split engine room
- A well thought out method of dividing the main engine room, the electric supply, DP and auxiliary systems
- A very reliable station keeping capability can be maintained when there is a major catastrophe
- The economics of increasing the number of the engine room partitions
15:30 A deep understanding of the special equipment of PSV, equipment installation casesharing
- According to the owner's demand, understand PSV equipment types
- Via the basic design to solve the problem of shortage of equipment installation space
- Difficulties and solutions of special equipment installation
- Case sharing: wire arrangement
16:00 Adding Functional Elements forBasic Supply Vessels to Conversionwith MPSV Features
- Design compliance checks
- Deck space allocation
- Machinery allocation
- Plan approval and execution of modifications
16:30 The End of Day Two
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
If you have any questions for registration or detail information, pls feel free to contact us ASAP.
Best Regards,
Paul Cao
Merisis Consulting Co.,Ltd
Phone: +86 21 6180 8505*214
Mobile: 13764695021
Fax: +86 21 6180 8511
Email:
paul.cao@merisis-asia.com
Web:
www.merisis-asia.com
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
Accommodation
The Millennium HongQiao Hotel Shanghai
The Millennium HongQiao Hotel Shanghai (Shanghai Qianxi Haiou Dajiudian) provides rooms which are no less than 40sqm.
They are one of the largest in Hongqiao area, facilities include separate Showers and Bath.
Executive Club Rooms also provides complimentary Internet.
2588 Yan An Xi Road
Shanghai, 201103
China
Phone: +86-21-6208 5888
http://www.millenniumhotels.com.cn/en/millenniumshanghai/
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
If you have any question about the accommodation, pls contact with our
operation manager:
Shirley Xie on phone: +86-21-61808505
shirley.xie@merisis-asia.com
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
ASTROMAN Magazine - 2014.06.09
Polish Company ORLEN acquires Birchill Exploration, new production assets in Canada, doubling its oil and gas reserves
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1728
ASTROMAN Magazine - 2014.05.14
Xu Jian, Ambasador Chińskiej Republiki Ludowej: Coraz lepsze perspektywy współpracy z Polską
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1711
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
ASTROMAN Magazine - 2014.04.24
3rd HEV Technology Summit 2014 on June 26-27 in Shanghai, China
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1701
ASTROMAN Magazine - 2014.04.19
Volkswagen Group starts electro-mobility campaign in China. EUR 18.2 Billion will be invested up to 2018
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1699
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
ASTROMAN Magazine - 2014.01.01
Big Idea 2014 By Jeff Immelt: The Age of Gas
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1624
ASTROMAN Magazine - 2013.12.22
Pratt & Whitney, Boeing Celebrate Delivery of First PW4062 Engines for KC-46 Tankers
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1607
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
ASTROMAN Magazine - 2013.12.08
General Electric Selects Oklahoma City Site for New Global Hub of Oil & Gas Technology Innovation
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1600
ASTROMAN Magazine - 2013.12.01
Matt Tsien Named General Motors China President
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1593
|
The Millennium HongQiao Hotel Shanghai Room Image
Courtesy of the Millennium HongQiao Hotel Shanghai |
|
ASTROMAN Magazine - 2013.12.01
EU domestic shale gas production could add a million jobs, new study shows
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1594
ASTROMAN Magazine - 2013.12.01
San Leon Energy to announce the successful execution of the vertical hydraulic fracture stimulations in Poland
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1592
ASTROMAN Magazine - 2013.09.18
Polish Company PKN ORLEN to acquire an upstream company TriOil Resources in Canada
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1560
ASTROMAN Magazine – 2012.04.29
China will set up a $10 billion line of credit to support cooperative projects with Central and Eastern Europe
http://www.astroman.com.pl/index.php?mod=magazine&a=read&id=1229
Editor-in-Chief of ASTROMAN magazine: Roman Wojtala, PhD.